What are the technical standards for high-pressure fertilizer pipes?

Posted by: steel world 2023-10-05 Comments Off on What are the technical standards for high-pressure fertilizer pipes?

Technical standards for high-pressure fertilizer pipes

High pressure fertilizer pipe GB6479-2000

High pressure fertilizer pipe specifications: 8-1240×1-200mm

High-pressure fertilizer pipe manufacturing process: hot rolling, cold drawing, thermal expansion

High-pressure fertilizer pipe standard: GB6479 – Chinese national standard

High-pressure fertilizer pipe uses: Seamless steel pipes used for high-pressure fertilizer equipment and pipelines.

Partial material list of high-pressure fertilizer pipe

121×6-7-8-10-12-14-16-20

273×30-35-38-40

127×-6-7-8-10-12-14-16-20

299×8-12-16-20-24-28

133×6-8-12-14-16-18-20-25-30

299×30-32-36-38-40

140×6-7-8-9-10-12-14-16-20-22

325×8-12-14-18-38

146×6-8-12-14-16-18-20-25-30

325×28-32-34-38

152×6-8-12-14-16-18-20-25-30

351×10-16-20-25-40

159×6-10-12-14

355×6-18-20-25-30-40

159×16-18-20-22-25-30

377×8-12-15-20-24-28

168×8-10-12-14-20-25-30-35

377×30-37-40

180×8-12-16-25-30

402×10-15-20-25-30-35

180×32-34-38-40

406×10-20-25-28-35-40

194×6-8-12-16-20-25-30-40

426×10-12-14-16-20-25-30-35-40

High-pressure fertilizer pipe weight formula: [(outer diameter-wall thickness)*wall thickness]*0.02466=kg/meter (weight per meter)

The main steel pipe grades produced for high-pressure fertilizer pipes are:

Serial number Grade Heat treatment system
1 10 normalizing
2 20 normalizing
3 16Mn normalizing
4 12CrMo 900~930℃ normalizing, 670~720℃ tempering, holding time: periodic furnace is more than 2h, continuous furnace is more than 1h
5 15CrMo 930~960℃ normalizing, 680~720℃ tempering, holding time: periodic furnace more than 2h, continuous furnace more than 1h
6 12Cr2Mo Normalizing at 900~960℃, tempering at 700~750℃, holding time: more than 1h
7 1Cr5Mo Annealing

High-pressure fertilizer pipe process flow: tube blank – inspection – metal forging – peeling – inspection – heating – perforation – pickling – grinding – lubrication and air drying – welding head – cold drawing – solidification Solution treatment – pickling – pickling and passivation – inspection – cold rolling – degreasing – cutting – air drying – internal polishing – external polishing – inspection – marking – finished product packaging

Industrial pipe and seamless pipe process flow: tube blank – inspection – peeling – inspection – heating – perforation – pickling – mushroom repair – lubrication and air drying – welding head – cold drawing – solid solution Treatment – pickling – pickling passivation – inspection

High-pressure fertilizer pipe delivery status: Steel pipes should be delivered after heat treatment as specified in the following table. The heat treatment system should be filled in the material certificate.

Link to this article:What are the technical standards for high-pressure fertilizer pipes?

Reprint Statement: If there are no special instructions, all articles on this site are original. Please indicate the source for reprinting:Alloy Wiki,thanks!^^