A general goal

Guarantee quality and quantity (quantity)

Scheduled and compliant (regulations)

Always approach zero defects.



Two important points

The first piece must be done, and the spot check is in place and there are few problems.

Pay attention to the abnormal process, eliminate the problem and remanufacture it.


Three no policy

Do not accept defective products

No defective products

Do not let go of defective products


Four major practices

Refer to the requirements of the work instruction to understand the essentials of your position

Refer to norms and standards

No first inspection (first article inspection)

Confirm after done


Five Ideas

Meet customer requirements, no discount on quality

Quality is not tested, but guaranteed by design, manufacturing, and habits

Active self-checks are better than countless passive checks

Do it once, any repairs and rework will affect the quality

Almost, probably, seems to be the enemy of the greatest quality


Six don’t let go

The reason can’t be found———Don’t let it go

Unclear responsibilities———Don’t let it go

Corrective measures are not implemented—don’t let go

Corrective measures are not verified—don’t let go

Effective measures are not included — do not let go


Seven wastes

Waiting, handling, moving, overproduction, inventory, substandard products, processing waste


Eight steps to solve the problem

Clarify problems, decompose problems, set goals, grasp the true cause, formulate countermeasures, implement countermeasures, evaluate results and processes, and consolidate results.


5W2H method

What—what is the problem? (main problem)

Why—Why do you want to do this (Goal) Clear goals and eliminate unnecessary steps

Where—Where/Where did you finish (location)

When—What time is the best, when to start/end (time) selection order

Who—-Who will execute it, who is in charge (person)

How—-How to complete, are there other methods (methods) to simplify the work

How much—How much is completed and how much cost (degree, cost)


4M1E

Man-people

Machine-machine

Material-materials

Method-method

Environment-environment


VIA technique

Value Analyss Method

Value Engineering method

Industrial Engineering (Industrial Engineering) technique

Quality Control (Quality Control) method


Quality control circle activities

5-10 colleagues in the same place form a small group. In response to the problems in the job, the members brainstorm, use VIQ techniques, turn the PDCA management cycle, implement independent management, and all employees participate and implement.


QC Seven Mantras

Check and receive data, control anti-mutation, histogram obvious distribution, Pola focus on key points, scatter to find correlation, layer to find differences, characteristics to find the main cause.


8D technique

Previous post: Seven habits of sales elites!

Next: How to choose stainless steel cabinets?The key points of buying good quality stainless steel cabinets

Link to this article:Likes|Mantra of factory management

Reprint Statement: If there are no special instructions, all articles on this site are original. Please indicate the source for reprinting:Alloy Wiki,thanks!^^