Home » Other » 1 » Shenhuo shares: the company’s Xinjiang electrolytic aluminum project operates at a normal capacity utilization rate of 100%

Shenhuo shares: the company’s Xinjiang electrolytic aluminum project operates at a normal capacity utilization rate of 100%

Posted by: aliyunhuicom 2021-10-25 Comments Off on Shenhuo shares: the company’s Xinjiang electrolytic aluminum project operates at a normal capacity utilization rate of 100%

Some investors asked Shenhuo Co., Ltd. (000933) whether the Xinjiang electrolytic aluminum project is operating normally and how is the utilization rate?

The company replied that the company’s Xinjiang electrolytic aluminum project is operating normally, with a capacity utilization rate of 100%

Link to this article:Shenhuo shares: the company's Xinjiang electrolytic aluminum project operates at a normal capacity utilization rate of 100%

Reprint Statement: If there are no special instructions, all articles on this site are original. Please indicate the source for reprinting:Alloy Wiki,thanks!^^